32LG40 (CHASSIS:LA89A) - LG TV Service Manual (repair manual). Page 14

Read LG 32LG40 (CHASSIS:LA89A) Service Manual online

7. Set the shipping mode (In-stop)
- After completing the final test, in order to set the set to the
shipping condition, press the In-Stop key of the R/C to make
sure that the set is turned off.
8. GND and resisting pressure test
8-1. How to test
(1) Preparing for the automatic test on the GND & resisting
pressure 
- Make sure that the power cord is inserted into the set
completely. (When it is disconnected or loosened, test
after inserting it)
(2) Perform the automatic test on the GND & resisting pressure
1) The set with power cord, the cord and the A/V
completely inserted into the tuner is loaded on the pallet
and entered into the automatic test process.
2) Connect the D-terminal AV JACK tester
3) Turn on the automatic (GWS103-4)
4) Perform the GND TEST
5) If it is not good, the buzzer is operated to notify the test
result to the operator.
6) If it is OK, it is automatically switched to the resisting
pressure test. (Disconnect the cord and the A/V from the
AV JACK BOX)
6) Perform the resisting pressure test
7) If it is not good, the buzzer is operated to notify the test
result to the operator.
8) If it is OK, the GOOD LAMP is turned and the stopper is
moves down, and it moves to the next process.
8-2. Items to manage
(1) TEST voltage
- GND : 1.5KV/min at 100mA
- SIGNAL : 3KV/min at 100mA
(2) TEST time:1 second
(3) TEST POINT
- GND test = between Power cord GND and Signal cable
metal GND
- Resisting pressure test = between Power cord GND and
Live & Neutral
(4) LEAKAGE CURRENT: Set to 0.5mArms 
9. ISP Download (option)
9-1. Overview
The Micom upgrade via the external port for the service for
the customer.
9-2. Device to use
1) PC
2) B/D for the interface (IIC & ISP)
3) Jig for downloading (for the power supply)
9-3. Adjustment wiring diagram (Download
device configuration diagram) 
9-4. Adjustment condition (Download
condition)
1) IC name & circuit number: MYSON MTV416GMF & IC4015
2) Power supply: 5V (P4004 Pin 3)
3) SCL: D-sub Pin 10
4) SDA: D-sub Pin  7
9-5. How to adjust (for downloading) 
1) After executing LGE Monitor Tools v1.1, click the first icon.
(See the figure)
2) When the screen is displayed as shown at the below figure,
set the items as follows:
- MCU Select: MTV512M64
- R/W Option: Auto Write(Verify)
- Jig Option: Myson
- Transmit Speed: Medium
- Check: blank
- PORT: Select the Parallel Port to use (LPT1 in general)
* caution: Select the EPP as LPT from the ROM BIAS
setting.
3) Click the Load File Button, and select the desired Hex File
to download. (If no file is displayed, make sure that the file
format is selected as Hex file (*.hex))
- 14 -
Interface B/D
Main B/D
PC
Pin301
Page of 35
Display

Click on the first or last page to see other 32LG40 (CHASSIS:LA89A) service manuals if exist.