ON TIME MICRO (serv.man5) - JBL Audio EMC - CB Certificate (repair manual). Page 3

Read JBL ON TIME MICRO (serv.man5) EMC - CB Certificate online

                                                   
                                                       
Page 3 of 106                      Report No.: NTEK-2011NT1009314E 
 
 
                                                                                                                                                                   
 
 
 
 
Table of Contents 
 
 
 
Page 
1 . TEST SUMMARY 
6
 
1.1 TEST FACILITY 
7
 
1.2 MEASUREMENT UNCERTAINTY 
7
 
2 . GENERAL INFORMATION 
8
 
2.1 GENERAL DESCRIPTION OF EUT 
8
 
2.2 DESCRIPTION OF TEST MODES 
9
 
2.3 DESCRIPTION OF TEST SETUP 
10
 
2.4 DESCRIPTION TEST PERIPHERAL AND EUT PERIPHERAL 
11
 
2.5 MEASUREMENT INSTRUMENTS LIST 
12
 
3 . EMC EMISSION TEST 
14
 
3.1 CONDUCTED EMISSION MEASUREMENT 
14
 
3.1.1 POWER LINE CONDUCTED EMISSION 
14
 
3.1.2 TEST PROCEDURE 
15
 
3.1.3 TEST SETUP 
15
 
3.1.4 EUT OPERATING CONDITIONS 
15
 
3.1.5 TEST RESULTS 
16
 
3.2 RADIATED EMISSION MEASUREMENT 
26
 
3.2.5 TEST PROCEDURE 
27
 
3.2.6 TEST SETUP 
28
 
3.2.7 EUT OPERATING CONDITIONS 
29
 
3.2.8 TEST RESULTS(30-1000MHz) 
30
 
3.2.9 TEST RESULTS(30-300MHz) 
40
 
3.3 HARMONICS CURRENT 
45
 
3.3.1 LIMITS OF HARMONICS CURRENT 
45
 
3.3.1.1 TEST PROCEDURE 
46
 
3.3.1.2 EUT OPERATING CONDITIONS 
46
 
3.3.1.3 TEST SETUP 
46
 
3.3.2 TEST RESULTS 
47
 
3.4 VOLTAGE FLUCTUATION AND FLICKERS 
53
 
3.4.1 LIMITS OF VOLTAGE FLUCTUATION AND FLICKERS 
53
 
3.4.1.1 TEST PROCEDURE 
53
 
3.4.1.2 EUT OPERATING CONDITIONS 
53
 
3.4.1.3 TEST SETUP 
53
 
3.4.2 TEST RESULTS 
54
 
4 . EMC IMMUNITY TEST 
55
 
4.1 GENERAL PERFORMANCE CRITERIA 
55
 
Page of 106
Display

Click on the first or last page to see other ON TIME MICRO (serv.man5) service manuals if exist.