Read JBL ON STAGEII (serv.man12) EMC - CB Certificate online
- Page 49 of 52 -
www.nemko.com
Report No. 46974
TRF No.:IECEN60950_1B
4.3.8 TABLE:
Batteries
N/A
The tests of 4.3.8 are applicable only when
appropriate battery data is not available
appropriate battery data is not available
Is it possible to install the battery in a reverse
polarity position?
polarity position?
Temperature
Non-rechargeable batteries
Rechargeable batteries
Discharging
Unintentional
charging
charging
Charging
Discharging
Reversed
charging
charging
Meas.
current
current
Manuf.
spec.
spec.
Meas.
current
current
Manuf.
spec.
spec.
Meas.
current
current
Manuf.
spec.
spec.
Meas.
current
current
Manuf.
spec.
spec.
Max
current
during
normal
conditions
current
during
normal
conditions
Max
current
during fault
conditions
current
during fault
conditions
supplementary information:
Test results:
Verdict
- Chemical leaks
N/A
- Explosion of the battery
N/A
- Emission of flame or expulsion of molten
metal
metal
N/A
- Electric strength test of equipment after
completion of tests
completion of tests
N/A
supplementary information:
Click on the first or last page to see other ON STAGEII (serv.man12) service manuals if exist.