ON BEAT RUMBLE (serv.man3) - JBL Audio EMC - CB Certificate (repair manual)

on beat rumble (serv.man3) emc - cb certificate
Model
ON BEAT RUMBLE (serv.man3)
Pages
47
Size
792 KB
Type
PDF
Document
EMC - CB Certificate
Brand
Device
Audio
File
on-beat-rumble-sm3.pdf
Date

Read JBL ON BEAT RUMBLE (serv.man3) EMC - CB Certificate online

 
 
 
 
 
 
 
TEST REPORT 
 
 
 
Report No.: 
EM201200813-7
 
Application No.: 
ZJ00024740 
Applicant: 
Harman International Industries, Incorporated 
Applicant 
Address: 
Sample 
Description: 
Wireless high-power speaker for lighting connector 
Model: 
JBL OnBeat Rumble 
Adding Model: 
Test Specification: 
EN 55013:2001+A1:2003+A2:2006<Sound and television broadcast 
receivers and associated equipment -Radio disturbance characteristics - Limits 
and methods of measurement> 
EN 55020:2007<Sound and television broadcast receivers and associated 
equipment - Immunity characteristics - Limits and methods of measurement> 
Test  Date: 
2012-12-25 to 2013-01-11 
Issue Date: 
2013-01-11 
Test Result: 
Pass. 
Tested By: 
Reviewed By: 
Approved By: 
Eddy Zong / Test Engineer 
Jane Cao /   Technical Support 
Gavin Wu /  Manager 
 
Date: 2013-01-11 
 
Date: 2013-01-11 
 
Date: 2013-01-11 
Other Aspects: 
 
 
Abbreviations: 
ok / P = passed; fail / F = failed; n.a. / N = not applicable 
The test result in this test report refers exclusively to the presented test sample. This report shall not be 
reproduced except in full, without the written approval of GRGT. 
GRG Metrology and Test Technology Co., Ltd. 
Address: 163, Pingyun Road, West of Huangpu Avenue, Guangzhou, Guangdong, P.R. China 
Tel:+86-20-38699960 Fax:+86-20-38695185 
Email: 
Ver.:2.0 / 01.Jan.2012 
Report No.:
 
EM201200813-7 
                       
Application No.:
 
ZJ00024740  
                  
Page 2 of 47
 
 
DIRECTIONS OF TEST 
 
1. This station carries out test task according to the national regulation of 
verifications which can be traced to National Primary Standards and BIPM. 
 
2. The test report merely corresponds to the test sample. It is not permitted to copy 
extracts of these test result without the written permission of the test laboratory. 
 
3. If there is any objection concerning the test, the client should inform the 
laboratory within 15 days from the date of receiving the test report. 
Report No.:
 
EM201200813-7 
                       
Application No.:
 
ZJ00024740  
                  
Page 3 of 47
 
 
 
Table of Contents
 
1. TEST RESULT SUMMARY ............................................................................................................................................... 4
 
2. GENERAL DESCRIPTION OF EUT ................................................................................................................................. 5
 
2.1
 
APPLICANT .................................................................................................................................................................... 5 
2.2
 
MANUFACTURER ......................................................................................................................................................... 5 
2.3
 
BASIC
 
DESCRIPTION
 
OF
 
EQUIPMENT
 
UNDER
 
TEST ............................................................................................. 5 
3. LABORATORY AND ACCREDITATIONS ..................................................................................................................... 6
 
3.1
 
LABORATORY ............................................................................................................................................................... 6 
3.2
 
ACCREDITATIONS ........................................................................................................................................................ 6 
3.3
 
MEASUREMENT
 
UNCERTAINTY ............................................................................................................................... 6 
3.4
 
TEST
 
INSTRUMENTS .................................................................................................................................................... 7 
3.5
 
MONITORING
 
OF
 
EUT
 
FOR
 
THE
 
IMMUNITY
 
TEST ................................................................................................. 8 
4. EMISSION TEST .................................................................................................................................................................. 9
 
4.1RADIATED
 
EMISSION
 
MEASUREMENT .................................................................................................................... 9 
4.1.1 LIMITS ...................................................................................................................................................................... 9
 
4.1.2 TEST PROCEDURE ................................................................................................................................................. 9
 
4.1.3 TEST SETUP .......................................................................................................................................................... 10
 
4.1.4 TEST RESULTS ...................................................................................................................................................... 11
 
4.2
 
CONDUCTED
 
EMISSION
 
MEASUREMENT ............................................................................................................. 15 
4.2.1 LIMITS .................................................................................................................................................................... 15
 
4.2.2 TEST PROCEDURES ............................................................................................................................................. 15
 
4.2.3 TEST SETUP .......................................................................................................................................................... 16
 
4.2.4 TEST RESULTS ...................................................................................................................................................... 17
 
4.2
 
DISTURBANCE
 
POWER
 
MEASUREMENT ...............................................................................................................  21 
4.2.1 LIMITS .................................................................................................................................................................... 21
 
4.2.2 TEST PROCEDURES ............................................................................................................................................. 21
 
4.2.3 TEST SETUP .......................................................................................................................................................... 21
 
4.2.4 TEST RESULTS ...................................................................................................................................................... 22
 
5. IMMUNITY TEST .............................................................................................................................................................. 27
 
5.1
 
GENERAL
 
DESCRIPTION ........................................................................................................................................... 27 
5.2
 
GENERAL
 
PERFORMANCE
 
CRITERIA
 
DESCRIPTION ..........................................................................................  28 
5.3
 
ELECTROSTATIC
 
DISCHARGE
 
(ESD) ......................................................................................................................  29 
5.3.1 TEST SPECIFICATION .......................................................................................................................................... 29
 
5.3.2 TEST PROCEDURE ............................................................................................................................................... 29
 
5.3.3 TEST SETUP .......................................................................................................................................................... 30
 
5.3.4 TEST RESULTS ...................................................................................................................................................... 31
 
5.4
 
IMMUNITY
 
TO
 
RF
 
VOLTAGE
 
OF
 
MAINS,
 
LOUDSPEAKER,
 
HEADPHONE
 
AND
 
AUDIO
 
CONNECTERS
 
(S2A)
 .............................................................................................................................................................................................. 32 
5.4.1 TEST REQUIREMENT ........................................................................................................................................... 32
 
5.5.2 TEST SETUP .......................................................................................................................................................... 33
 
5.5.3 TEST RESULTS ...................................................................................................................................................... 34
 
5.5
 
IMMUNITY
 
TO
 
AMBIENT
 
ELECTROMAGNETIC
 
FIELDS
 
(S3) .............................................................................  37 
5.5.1 TEST REQUIREMENT ........................................................................................................................................... 37
 
5.5.2 TEST RESULTS ...................................................................................................................................................... 38
 
5.6
 
IMMUNITY
 
TO
 
ELECTROMAGNETIC
 
FIELDS
 
KEYED
 
CARRIER
 
(S5) ............................................................... 39 
5.6.1 TEST REQUIREMENT ........................................................................................................................................... 39
 
5.6.2 TEST RESULTS ...................................................................................................................................................... 39
 
APPENDIX A: PHOTOGRAPH OF THE TEST CONFIGURATION .............................................................................  40
 
APPENDIX B: PHOTOGRAPHS OF EUT .......................................................................................................................... 43
 
Report No.:
 
EM201200813-7 
                       
Application No.:
 
ZJ00024740  
                  
Page 4 of 47
 
 
1. TEST RESULT SUMMARY  
EMISSION (EN 55013:2001+A1:2003+A2:2006) 
Standard 
Item 
Remarks
Result 
EMISSION (EN 
55013:2001+A1:2003+
A2:2006) 
Radiated Emission 
Table 5 
Pass 
Conducted emission 
measurement 
Table 1 
Pass 
Disturbance voltage at the 
antenna terminals 
Table 2 
N/A 
Disturbance power 
Table 4 
Pass 
 
 
IMMUNITY (EN 55020:2007) 
Standard 
Item 
Requirements of Performance
 
Result
EN 61000-4-2:2009 
ESD 
Criterion B 
Pass 
EN 55020:2007 
S2a 
Meets the requirements of subpart 
4.3.2 in EN 55020 
Pass 
EN 55020:2007 
S3 
Meets the requirements of subpart 
4.3.4 in EN 55020 
Pass 
EN 55020:2007 
S5 
Meets the requirements of subpart 
4.3.6 in EN 55020 
Pass 
 
 
 
Page of 47
Display

Download JBL ON BEAT RUMBLE (serv.man3) EMC - CB Certificate

Here you can read online and download JBL ON BEAT RUMBLE (serv.man3) EMC - CB Certificate in PDF. ON BEAT RUMBLE (serv.man3) emc - cb certificate will guide through the process and help you recover, restore, fix, disassemble and repair JBL ON BEAT RUMBLE (serv.man3) Audio. Information contained in service manuals typically includes schematics / circuit diagrams, wiring diagrams, block diagrams, printed wiring boards, exploded views, parts list, disassembly / assembly, pcb.