FM SUB - JBL Audio User Guide / Operation Manual. Page 6

Read JBL FM SUB User Guide / Operation Manual online

New Construction
Step One:
Remove the grille from the
speaker frame.
Step Two:
Attach the proper mounting
bracket, marked and preset at
3/8", 1/2", 5/8", and 3/4" to the
speaker frame.
Step Three:
Determine the correct speaker
location.
1-1/2"
1-1/2"
1-1/2"
Step Four:
Nail or screw the speaker frame
assembly to the wall studs and
route the wires through the
frame opening.
Step Five:
Cut the drywall.
Step Six:
Connect the speaker wires to
the baffle assembly and install
baffle assembly in frame. Do
not overtighten the baffle
screws.
After the Drywall is Installed 
Step Seven:
Replace the metal grille.
FM Series Owner’s Manual  7/22/98 9:27 AM  Page 6
Page of 12
Display

Click on the first or last page to see other FM SUB service manuals if exist.