Read JBL DUET II (serv.man5) EMC - CB Certificate online
Ident. Nr.:
114383
Date:
2008-11-09
114383 EMC TRF.doc
page 21 of 38
7.5 Table
7.5.1 Table 006
Flicker Test Summary per EN/IEC61000-3-3 (Run time)
EUT: Duet II
Tested by: Test Operator
Test Margin: 100
Test date: 10/29/2008
Start time: 3:56:47 PM
End time: 4:07:08 PM
Test duration (min): 10
Data file name: F-000850.cts_data
Comment: Connect to PC(Play MP3)
Customer: Customer
Test Result: Pass
Customer: Customer
Test Result: Pass
Status: Test Completed
Pst
i
and limit line
Limits
0.25
0.50
0.75
1.00
Pst
16:07:07
Plt and limit line
0.0
0.1
0.2
0.3
0.4
0.5
0.6
Plt
16:07:07
Parameter values recorded during the test:
Vrms at the end of test (Volt):
Vrms at the end of test (Volt):
230.05
Highest dt (%):
0.00
Test limit (%):
3.30
Pass
Time(mS) > dt:
0.0
Test limit (mS):
500.0
Pass
Highest dc (%):
0.00
Test limit (%):
3.30
Pass
Highest dmax (%):
0.00
Test limit (%):
4.00
Pass
Highest Pst (10 min. period): 0.064
Test limit: 1.000
Pass
Click on the first or last page to see other DUET II (serv.man5) service manuals if exist.