Read JBL AS SUB User Guide / Operation Manual online
New Construction
Step One:
Remove the grille from the
speaker frame.
Remove the grille from the
speaker frame.
Step Three:
Attach the proper mounting
brackets, marked and preset at
3/8", 1/2", 5/8", and 3/4", corre-
sponding to the thickness of
the dry wall, to the speaker
frame.
Attach the proper mounting
brackets, marked and preset at
3/8", 1/2", 5/8", and 3/4", corre-
sponding to the thickness of
the dry wall, to the speaker
frame.
Step Two:
Determine the correct speaker
location.
Determine the correct speaker
location.
≥
1-1/2"
≥
1-1/2"
≥
1-1/2"
Step Four:
Nail or screw the speaker-frame
assembly to the wall studs and
route the wires through the
frame opening.
Nail or screw the speaker-frame
assembly to the wall studs and
route the wires through the
frame opening.
Step Five:
Cut the drywall.
Cut the drywall.
Step Six:
Connect the speaker wires to
the baffle assembly and install
baffle assembly in frame. Do
not overtighten the baffle
screws.
Connect the speaker wires to
the baffle assembly and install
baffle assembly in frame. Do
not overtighten the baffle
screws.
Step Seven:
Replace the metal grille.
Replace the metal grille.
After the Drywall is Installed
AS Series Owner’s Manual 9/11/98 12:51 PM Page 6