Read Harman Kardon DVD 23 (serv.man12) EMC - CB Certificate online
Report No. JSH05110331-001
Page 1 of 64
EMC TEST REPORT
No. JSH05110331-001
Applicant :Harman
Consumer Group International
2,Route de Tours 72500 Chateau du Loir France
Manufacturer
: WANLIDA GROUP CO., LTD.
Wanlida Industry Zone, Nanjing, Fujian, China
363601
363601
Equipment :DVD
Player
Type/Model :DVD23
SUMMARY
The equipment comply with the requirements according to the following standards:
EN55013:
2001/+A1: 2003
:
Limits and methods of measurement of radio disturbance
characteristics of broadcast receivers and associated equipment
EN55020: 2002/+A1:2003: Electromagnetic immunity of broadcast receivers and
associated equipment.
EN 61000-3-2: 2000/+A2:2005: Limits for harmonic current emissions(equipment
input current <=16A per phase)
associated equipment.
EN 61000-3-2: 2000/+A2:2005: Limits for harmonic current emissions(equipment
input current <=16A per phase)
EN 61000-3-3: 1995/+A1:2001: Limitation of voltage fluctuations and flicker in low-
voltage supply systems for equipment with rated current <=16A
voltage supply systems for equipment with rated current <=16A
Date of issue: December 9, 2005
Prepared by:
Approved by:
Daniel Zhao( Project engineer)
Jonny Jing (Reviewer)
Report No. JSH05110331-001
Page 2 of 64
Content
SUMMARY
................................................................................................................................1
1.GENERAL INFORMATION.............................................................................................................6
1.1 Description of Equipment Under Test (EUT)......................................................6
1.2 Description of Client............................................................................................6
1.3 Description of Test Facility .................................................................................7
1.2 Description of Client............................................................................................6
1.3 Description of Test Facility .................................................................................7
2.TEST SPECIFICATIONS ..................................................................................................................8
2.1 Standards..............................................................................................................8
2.2 Mode of operation during the test / Test peripherals used...................................8
2.3 Instrument list ......................................................................................................8
2.4.Test Summary ....................................................................................................10
2.2 Mode of operation during the test / Test peripherals used...................................8
2.3 Instrument list ......................................................................................................8
2.4.Test Summary ....................................................................................................10
E
MISSION
T
EST
......................................................................................................................................11
3. M
AINS
/A
NTENNA
T
ERMINAL
C
ONTINUOUS
D
ISTURBANCE
V
OLTAGE
............................................11
3.1 Limits of disturbance .........................................................................................11
3.1.1 Limits of disturbance voltage at the mains terminals
.................................................11
3.1.2 Limits of disturbance voltage at the antenna terminals
..............................................11
3.1.3 Limits of the wanted signal and disturbance voltage at RF output terminals of equipment
with RF video modulator
with RF video modulator
............................................................................................12
3.2 Block diagram of test set up...............................................................................13
3.2.1 set up at mains terminal
.....................................................................................13
3.2.2 set up at antenna terminal
....................................................................................13
3.2.3 set up for wanted signal and disturbance voltage at the RF output of video recorders
..................14
3.3 Test Setup and Test Procedure...........................................................................15
3.3.1 for mains terminals
............................................................................................15
3.3.2 for antenna terminal
...........................................................................................15
3.3.3 Photo of test setup
.............................................................................................15
3.4 Test Protocol ......................................................................................................16
3.5 Test curve...........................................................................................................17
3.6 Measurement Uncertainty..................................................................................17
3.7 Additions, Deviations and Exclusions from Standards......................................17
3.5 Test curve...........................................................................................................17
3.6 Measurement Uncertainty..................................................................................17
3.7 Additions, Deviations and Exclusions from Standards......................................17
4. C
ONTINUOUS
D
ISTURBANCE
P
OWER
................................................................................................18
4.1 Disturbance Power Limits for the frequency range 30MHz to 300MHz...........18
4.2 Block Diagram of Test Setup.............................................................................19
4.3 Test Setup and Test Procedure...........................................................................19
4.2 Block Diagram of Test Setup.............................................................................19
4.3 Test Setup and Test Procedure...........................................................................19
4.3.1 Photo of test setup
.............................................................................................20
4.4 Test Protocol ......................................................................................................20
4.5 Test curve...........................................................................................................20
4.6 Measurement Uncertainty..................................................................................23
4.7 Additions, Deviations and Exclusions from Standards......................................23
4.5 Test curve...........................................................................................................20
4.6 Measurement Uncertainty..................................................................................23
4.7 Additions, Deviations and Exclusions from Standards......................................23
5. R
ADIATED EMISSION
..........................................................................................................................24
5.1 Radiated emission limit from frequency range 30MHz – 1000MHz ................24
5.2 Block diagram and test set up ............................................................................24
5.3 Test Protocol ......................................................................................................25
5.4 Emission waveform ...........................................................................................25
5.5 Measurement uncertainty...................................................................................25
5.2 Block diagram and test set up ............................................................................24
5.3 Test Protocol ......................................................................................................25
5.4 Emission waveform ...........................................................................................25
5.5 Measurement uncertainty...................................................................................25
Report No. JSH05110331-001
Page 3 of 64
5.6 Additions, Deviations and Exclusions from Standards......................................25
6. H
ARMONICS
.......................................................................................................................................26
6.1 Block Diagram of Test Setup.............................................................................26
6.2 Test Setup and Test Procedure...........................................................................26
6.3 Test Protocol ......................................................................................................26
6.4 Measurement Uncertainty..................................................................................26
6.5 Additions, Deviations and Exclusions from Standards......................................26
6.2 Test Setup and Test Procedure...........................................................................26
6.3 Test Protocol ......................................................................................................26
6.4 Measurement Uncertainty..................................................................................26
6.5 Additions, Deviations and Exclusions from Standards......................................26
7. V
OLTAGE
F
LUCTUATIONS
-F
LICKER
.................................................................................................27
7.1 Block Diagram of Test Setup.............................................................................27
7.2 Test Setup and Test Procedure...........................................................................27
7.2 Test Setup and Test Procedure...........................................................................27
7.2.1 Definition
........................................................................................................27
7.2.2 Photo For test Set-up
.........................................................................................27
7.3 Test Protocol ......................................................................................................28
7.4 Measurement Uncertainty..................................................................................28
7.5 Additions, deviations and exclusions from standards........................................28
7.4 Measurement Uncertainty..................................................................................28
7.5 Additions, deviations and exclusions from standards........................................28
I
MMUNITY
T
EST
.....................................................................................................................................29
M
EASUREMENT
U
NCERTAINTY
.............................................................................................................29
8. I
MMUNITY REQUIREMENTS FOR THE ANTENNA INPUT CONNECTOR
................................................30
8.1 Requirements for input immunity to RF voltages (in differential mode) of the
VHF band II part of sound receivers and of satellite sound receivers .....................30
VHF band II part of sound receivers and of satellite sound receivers .....................30
8.1.1 Test result
........................................................................................................30
8.1.2 Operating environment
.......................................................................................30
8.1.3 Test set-up
.......................................................................................................30
8.1.4 Test protocol
....................................................................................................30
8.2 Requirements for input immunity to RF voltages ( in differential mode) of
television receivers and video tape equipment (including satellite television
receivers) (S1, S1a) ..................................................................................................33
television receivers and video tape equipment (including satellite television
receivers) (S1, S1a) ..................................................................................................33
8.2.1 Test result
........................................................................................................33
8.2.2 Operating environment
.......................................................................................33
8.2.3 Test set-up
.......................................................................................................33
8.2.4 Test protocol
....................................................................................................34
8.3 Requirements for immunity to RF voltages ( in common mode) (S2b) ............35
8.3.1 Test result
........................................................................................................35
8.3.2 Operating environment
.......................................................................................35
8.3.3 Test set-up
.......................................................................................................35
8.3.4 Test protocol
....................................................................................................35
9. I
MMUNITY REQUIREMENTS AT LOUDSPEAKER AND HEADPHONE OUTPUT CONNECTOR
(S2
A
).......36
9.1 Test result...........................................................................................................36
9.2 Operating environment ......................................................................................36
9.3 Test set-up..........................................................................................................36
9.2 Operating environment ......................................................................................36
9.3 Test set-up..........................................................................................................36
9.3.1 Photo For test Set-up
.........................................................................................36
9.4 Performance Criterion : A..................................................................................36
9.5 Figure for test set up ..........................................................................................36
9.6 Test protocol ......................................................................................................38
9.5 Figure for test set up ..........................................................................................36
9.6 Test protocol ......................................................................................................38
10. I
MMUNITY REQUIREMENTS FOR AUDIO INPUT AND OUTPUT CONNECTORS
(
EXCLUDING
LOUDSPEAKER AND HEADPHONE
) (S2
A
) ...............................................................................................38
10.1 Test result.........................................................................................................38
10.2 Operating environment ....................................................................................38
10.3 Test set-up........................................................................................................38
10.2 Operating environment ....................................................................................38
10.3 Test set-up........................................................................................................38