BDS 570 (serv.man3) - Harman Kardon Audio EMC - CB Certificate (repair manual)

bds 570 (serv.man3) emc - cb certificate
Model
BDS 570 (serv.man3)
Pages
127
Size
15.07 MB
Type
PDF
Document
EMC - CB Certificate
Brand
Device
Audio
File
bds-570-sm3.pdf
Date

Read Harman Kardon BDS 570 (serv.man3) EMC - CB Certificate online

R
 
AUDIX Technology (Shenzhen) Co., Ltd.
 
 
                                    Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E11588      page 2 of 336 
 
 
 
 
 
EMC TEST REPORT 
 
For 
 
Harman Consumer, Inc 
 
BLU-RAY DISC SYSTEM 
 
Brand Name 
Model No. 
harman/ kardon 
BDS570, BDS570BQ, BDS570W, 
BDS270, BDS270BQ, BDS270W 
 
 
 
 
 
 
 
 
 
 
Prepared for : Harman Consumer, Inc 
8500 Balboa Blvd, Northridge, CA 91329, UNITED STATES 
 
 
 
 
 
Prepared By : Audix Technology (Shenzhen) Co., Ltd. 
No. 6, Ke Feng Rd., 52 Block, 
Shenzhen Science & Industrial Park, 
Nantou, Shenzhen, Guangdong, China 
 
Tel: (0755) 26639496 
Fax: (0755) 26632877 
 
 
 
 
Report Number  : ACS-E11588 
Date of Test   
: Jun.25~Aug.14, 
2011 
Date of Report  : Aug.17, 
2011  
R
 
AUDIX Technology (Shenzhen) Co., Ltd.
 
 
                                    Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E11588      page 3 of 336 
 
 
 
TABLE OF CONTENT 
Description Page 
TEST REPORT VERIFICATION
....................................................................................... 7
 
1. 
SUMMARY OF STANDARDS AND RESULTS .............................................................. 8 
1.1.
 
Description of Standards and Results ....................................................................................... 8
 
2. 
GENERAL INFORMATION.............................................................................................. 9 
2.1.
 
Description of Device (EUT).................................................................................................... 9
 
2.2.
 
Tested Supporting System Details .......................................................................................... 10
 
2.3.
 
Block Diagram of connection between EUT and simulators.................................................. 11
 
2.4.
 
Test Facility ............................................................................................................................ 12
 
2.5.
 
Measurement Uncertainty(95% confidence levels, k=2)................................................... 12
 
3. 
POWER LINE CONDUCTED EMISSION TEST ......................................................... 13 
3.1.
 
Test Equipments ..................................................................................................................... 13
 
3.2.
 
Block Diagram of Test Setup.................................................................................................. 13
 
3.3.
 
Test Standard .......................................................................................................................... 13
 
3.4.
 
Power Line Conducted Emission Limit.................................................................................. 13
 
3.5.
 
EUT Configuration on Test .................................................................................................... 13
 
3.6.
 
Operating Condition of EUT .................................................................................................. 14
 
3.7.
 
Test Procedure ........................................................................................................................ 14
 
3.8.
 
Power Line Conducted Emission Test Results ....................................................................... 14
 
4. 
CONDUCTED DISTURBANCE AT TELECOMMUNICATION PORTS TEST ...... 36 
4.1.
 
Test Equipments ..................................................................................................................... 36
 
4.2.
 
Block Diagram of Test Setup.................................................................................................. 36
 
4.3.
 
Test Standard .......................................................................................................................... 36
 
4.4.
 
Conducted Disturbance at Telecommunication Ports Limit ................................................... 36
 
4.5.
 
EUT Configuration on Test .................................................................................................... 37
 
4.6.
 
Operating Condition of EUT .................................................................................................. 37
 
4.7.
 
Test Procedure ........................................................................................................................ 37
 
4.8.
 
Conducted Disturbance at Telecommunication Ports Test Results ........................................ 37
 
5. 
RADIATED EMISSION TEST......................................................................................... 39 
5.1.
 
Test Equipments ..................................................................................................................... 39
 
5.2.
 
Block Diagram of Test Setup.................................................................................................. 40
 
5.3.
 
Test Standard .......................................................................................................................... 41
 
5.4.
 
Radiated Emission Limit......................................................................................................... 41
 
5.5.
 
EUT Configuration on Test .................................................................................................... 41
 
5.6.
 
Operating Condition of EUT .................................................................................................. 41
 
5.7.
 
Test Procedure ........................................................................................................................ 42
 
5.8.
 
Radiated Emission Test Results.............................................................................................. 42
 
6. 
DISTURBANCE POWER TEST...................................................................................... 54 
6.1.
 
Test Equipments ..................................................................................................................... 54
 
6.2.
 
Block Diagram of Test Setup.................................................................................................. 54
 
6.3.
 
Disturbance Power Limit ........................................................................................................ 54
 
6.4.
 
EUT Configuration on Test .................................................................................................... 54
 
6.5.
 
Operating Condition of EUT .................................................................................................. 54
 
6.6.
 
Test Procedure ........................................................................................................................ 55
 
6.7.
 
Disturbance Power Test Result............................................................................................... 55
 
7. 
HARMONIC CURRENT EMISSION TEST ................................................................ 213 
7.1.
 
Test Equipments ................................................................................................................... 213
 
7.2.
 
Block Diagram of Test Setup................................................................................................ 213
 
R
 
AUDIX Technology (Shenzhen) Co., Ltd.
 
 
                                    Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E11588      page 4 of 336 
 
7.3.
 
Test Standard ........................................................................................................................ 213
 
7.4.
 
Limits of Harmonic Current.................................................................................................. 213
 
7.5.
 
EUT Configuration on Test .................................................................................................. 213
 
7.6.
 
Operating Condition of EUT ................................................................................................ 214
 
7.7.
 
Test Procedure ...................................................................................................................... 214
 
7.8.
 
Test Results........................................................................................................................... 214
 
8. 
VOLTAGE FLUCTUATIONS & FLICKER TEST..................................................... 224 
8.1.
 
Test Equipments ................................................................................................................... 224
 
8.2.
 
Block Diagram of Test Setup................................................................................................ 224
 
8.3.
 
Test Standard ........................................................................................................................ 224
 
8.4.
 
Limits of Voltage Fluctuation and Flick............................................................................... 224
 
8.5.
 
EUT Configuration on Test .................................................................................................. 224
 
8.6.
 
Operating Condition of EUT ................................................................................................ 224
 
8.7.
 
Test Procedure ...................................................................................................................... 224
 
8.8.
 
Test Results........................................................................................................................... 224
 
9. 
DISTURBANCE VOLTAGE AT THE ANTENNATERMINALS ............................. 228 
9.1.
 
Test Equipments ................................................................................................................... 228
 
9.2.
 
Block Diagram of Test Setup................................................................................................ 228
 
9.3.
 
Limits of disturbance voltage at the antenna terminals: ....................................................... 228
 
9.4.
 
EUT Configuration on Test .................................................................................................. 228
 
9.5.
 
Operating Condition of EUT ................................................................................................ 228
 
9.6.
 
Test Procedure ...................................................................................................................... 229
 
9.7.
 
Test Result ............................................................................................................................ 230
 
10. 
IMMUNITY PERFORMANCE CRITERIA DESCRIPTION .................................... 231 
11. 
ELECTROSTATIC DISCHARGE IMMUNITY TEST .............................................. 233 
11.1.
 
Test Equipments ................................................................................................................... 233
 
11.2.
 
Block Diagram of Test Setup................................................................................................ 233
 
11.3.
 
Test Standard ........................................................................................................................ 233
 
11.4.
 
Severity Levels and Performance Criterion .......................................................................... 233
 
11.5.
 
EUT Configuration ............................................................................................................... 233
 
11.6.
 
Operating Condition of EUT ................................................................................................ 233
 
11.7.
 
Test Procedure ...................................................................................................................... 234
 
11.8.
 
Test Results........................................................................................................................... 234
 
12. 
RF FIELD STRENGTH SUSCEPTIBILITY TEST..................................................... 236 
12.1.
 
Test Equipments ................................................................................................................... 236
 
12.2.
 
Block Diagram of Test Setup................................................................................................ 236
 
12.3.
 
Test Standard ........................................................................................................................ 236
 
12.4.
 
Severity Levels and Performance Criterion .......................................................................... 236
 
12.5.
 
EUT Configuration ............................................................................................................... 236
 
12.6.
 
Operating Condition of EUT ................................................................................................ 236
 
12.7.
 
Test Procedure ...................................................................................................................... 237
 
12.8.
 
Test Results........................................................................................................................... 237
 
13. 
RF E.M. FIELD KEYED CARRIER TEST .................................................................. 239 
13.1.
 
Test Equipments ................................................................................................................... 239
 
13.2.
 
Block Diagram of Test Setup................................................................................................ 239
 
13.3.
 
Test Standard ........................................................................................................................ 239
 
13.4.
 
Severity Levels and Performance Criterion .......................................................................... 239
 
13.5.
 
EUT Configuration ............................................................................................................... 239
 
13.6.
 
Operating Condition of EUT ................................................................................................ 240
 
13.7.
 
Test Procedure ...................................................................................................................... 240
 
13.8.
 
Test Results........................................................................................................................... 240
 
14. 
ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST.............................. 242 
14.1.
 
Test Equipments ................................................................................................................... 242
 
14.2.
 
Block Diagram of Test Setup................................................................................................ 242
 
Page of 127
Display

Download Harman Kardon BDS 570 (serv.man3) EMC - CB Certificate

Here you can read online and download Harman Kardon BDS 570 (serv.man3) EMC - CB Certificate in PDF. BDS 570 (serv.man3) emc - cb certificate will guide through the process and help you recover, restore, fix, disassemble and repair Harman Kardon BDS 570 (serv.man3) Audio. Information contained in service manuals typically includes schematics / circuit diagrams, wiring diagrams, block diagrams, printed wiring boards, exploded views, parts list, disassembly / assembly, pcb.