Read Harman Kardon AURA (serv.man3) EMC - CB Certificate online
Report No.: EM201300550-9 Application No.: ZJ00032797 Page 52 of 69
5.6 SURGE IMMUNITY TEST
5.6.1 TEST SPECIFICATION
Basic Standard:
EN 61000-4-5:2006
Wave-Shape:
CW 1.2μs/50μs
Test Voltage:
Line to line 0.5kV; line to PE 1kV
Generator Source Impedance:
Line to line 2ohm; line to PE 12ohm
Polarity:
Positive and Negative
Phase Angle:
0°, 90°, 180°, 270°
Pulse Repetition Rate:
60s
Number of Tests:
5 times
5.6.2 TEST PROCEDURE
a) For EUT power supply:
The surge is applied to the EUT power supply terminals via the capacitive coupling network.
Decoupling networks are required in order to avoid possible adverse effects on equipment not under test
that may be powered by the same lines, and to provide sufficient decoupling impedance to the surge
wave. The power cord between the EUT and the coupling/decoupling networks was shorter than 2
meters in length.
b) For test applied to unshielded un-symmetrically operated interconnection lines of EUT: The surge
was applied to the lines via the capacitive coupling. The coupling / decoupling networks didn’t influence
the specified functional conditions of the EUT. The interconnection line between the EUT and the
coupling/decoupling networks was shorter than 2 meters in length.
The surge is applied to the EUT power supply terminals via the capacitive coupling network.
Decoupling networks are required in order to avoid possible adverse effects on equipment not under test
that may be powered by the same lines, and to provide sufficient decoupling impedance to the surge
wave. The power cord between the EUT and the coupling/decoupling networks was shorter than 2
meters in length.
b) For test applied to unshielded un-symmetrically operated interconnection lines of EUT: The surge
was applied to the lines via the capacitive coupling. The coupling / decoupling networks didn’t influence
the specified functional conditions of the EUT. The interconnection line between the EUT and the
coupling/decoupling networks was shorter than 2 meters in length.
c) For test applied to unshielded symmetrically operated interconnection / telecommunication lines of
EUT:The surge was applied to the lines via gas arrestors coupling. Test levels below the ignition point
of the coupling arrestor were not specified. The interconnection line between the EUT and the
coupling/decoupling networks was shorter than 2 meters in length.
EUT:The surge was applied to the lines via gas arrestors coupling. Test levels below the ignition point
of the coupling arrestor were not specified. The interconnection line between the EUT and the
coupling/decoupling networks was shorter than 2 meters in length.
5.6.3 TEST SETUP