WV-NM100 - Panasonic Video Monitoring Service Manual (repair manual). Page 10

Read Panasonic WV-NM100 Service Manual online

– 7 –
2-3. Confirmation Procedure
Power is Supplied
Note: It will take around 2 minutes until it becomes usable, and the Network Camera can not be oper-
ated in the meantime.
When the power is supplied, the power LED lights up for around 80 seconds and then blinks for
around 20 seconds. Then the camera performs one complete panning and tilting operation.
Confirmation of the Power LED light on.
Is the +9V DC supplied from the AC Adapter?
Is the +5V DC supplied to Pin 5 of E2 on the Power Board?
Not Light
Referring to Fig. 2-3, check the DC Voltage at Pin 5 (V5A) and Pin 7 (V3A) of E2 on the Power Board
Replace the AC Adapter.
Not Supplied
Confirm the DC Voltage of the Power Board.
Supplied
Is the +3.3V DC supplied to Pin 7 of E2?
Not Supplied
• +9V, +5V and +3.3V DC Circuit on the Power Board
have problem.
(
Refer to    ,     ,     of the SCHEMATIC DIAGRAM 
OF POWER BOARD 
on page 16.)
• Otherwise, the power line on the Power Board is
shorted to ground possibility.
Not Supplied
Supplied
• +5V DC Circuit on the Power Board has problem.
(
Refer to    of the SCHEMATIC DIAGRAM OF 
POWER BOARD 
on page 16.)
Is the +3.3V DC supplied to Pin 7 of E2 on the Power Board?
• +3.3V DC Circuit on the Power Board has problem.
(
Refer to     of the SCHEMATIC DIAGRAM OF POWER BOARD on 
page 16.)
Not Supplied
Supplied
• Power Board has no problem.
• Power LED has problem.
Proceed to next step  Confirmation of the Camera Detection .
To page 8
E2
(Pin 1)
Power Board
Pin 5 (V5A)
Pin 7 (V3A)
(Pin 10:For Ground)
(View after removing the Bottom Case.)
Fig. 2-3
Light ON
Supplied
C
B
A
B
A
Page of 25
Display

Click on the first or last page to see other WV-NM100 service manuals if exist.